Map & Monitoring

Map & Monitoring

Monitoring the detonation

Here we track environmental predictions and sampling related specifically to the detonation at the Iowa Army Ammunition Plant, confirmed for November 25, 2026. This is separate from the regional monitoring below.

Where could the plume travel?

The U.S. Army has published computer-generated maps estimating where lead particles could travel through the air and settle on the ground (scientists call this settling surface deposition). These maps are predictions based on weather and modeling.

  • Army projection maps for the November 25 plan: mitigated surface deposition and air dispersion (as of 8:00 a.m. CST, November 25, 2026) — no change

    Published November 25, 2026 by U.S. Army

    Modeled scenario: a detonation on November 25, 2026, 09:00 Central. Current schedule on the Timeline

    The Army reports no change from the 7:00 a.m.

    Page 1 of 2 of the U.S. Army projection document published November 25, 2026 (archived map image; open the original for full detail)Page 2 of 2 of the U.S. Army projection document published November 25, 2026 (archived map image; open the original for full detail)
    Modeled projection maps from the U.S. Army. Original document

    View projection details →

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

This projection is now on Projection details.

What has been measured?

Comparing baseline and post-detonation samples can help researchers identify changes in lead levels.

The Army has reported collecting baseline samples. EPA reports it had collected over 1,001 combined air, land, and water samples before the detonation, as of November 24. We have not yet obtained the results.
Sources: IAAAP public advisory (November 15, 2026) · EPA news release: EPA, Army and other federal partners provide public update on Iowa Army Ammunition Plant

Sampling requirements & review details

What the permit requires

The EPA emergency permit requires sampling and monitoring before, during and after the detonation (Condition IV.Q.1).

What the agencies have announced

The Army public advisory of November 15 reports that baseline sampling occurred. The actual results are unavailable in this tracker.

Statements about planned activities. Results are listed only once they are published.

  • Army sampling before and after the detonation

    Says soil, air and water near the site are being tested before and after the detonation so the Army can act where lead is deposited, and that U.S. government personnel will sample after the detonation and publish results when available. Its November 24 announcement adds that stationary air sensors will run along the installation perimeter and in nearby communities during the event, and that mobile teams will collect soil, surface-water and surface-wipe samples along the plume path afterward.

    Public statement by U.S. Army.

  • EPA's own sampling

    Says it is conducting its own air, water and soil sampling. As of November 24 it reported over 1,001 combined air, land and water samples collected before the detonation, and says it will continue sampling during and after the detonation and report the data in a timely and effective manner. It has published no sample results.

    Public statement by U.S. Environmental Protection Agency.

  • Army cleanup of residential properties

    Says that if any residential property tests above 200 parts per million (mg/kg), the RCRA-approved standard it cites, remediation teams will remove affected soil, clean surfaces and restore the property at government expense.

    Public statement by U.S. Army.

Who is responsible for what, and how to reach them

How results are listed

We list published results that include units and a cited source. Results announced but not yet published are marked pending. A result below the detection limit is labeled “not detected.”

Air results are reported per volume of air, usually micrograms per cubic metre (µg/m³). Soil results are reported per weight of soil, usually milligrams per kilogram (mg/kg). Air and soil results use different units and cannot be directly compared.

Before and after the detonation

A sample is placed before or after the detonation using its collection window and the confirmed detonation date and time. Samples collected across the detonation, or with timing too coarse to place, are labeled that way.

The confirmed detonation date and time is November 25, 2026.

Review history

Lead in the air: last checked successfully November 25, 2026, 18:59 UTC (Claude (maintainer)), results found. Review record

Lead in the soil: last checked successfully November 25, 2026, 14:47 UTC (Claude (maintainer)), no results found. Review record

Full review log

Regional environmental monitoring

20 EPA-listed stations within 100 miles of the Iowa Army Ammunition Plant have collected air quality samples since January 2024.

The map shows historical readings from these stations. Our retrieved EPA data contains no lead (Pb) readings from 2026.

Showing all stations, including historical or undated ones.

Stations 46 / 46

The interactive map needs JavaScript and map tiles. The station list and each station's page work without it.

Map key

  • Other monitoring: sampling since January 2024 (20)
  • Historical or undated monitoring station, lead monitor listed (26)
  • Multiple stations
How to read the map

Filled markers: stations with EPA sampling since January 2024. Hollow markers: historical or undated listings.

“Pb” (the chemical symbol for lead) marks stations where EPA lists a lead monitor. None has lead sampling since January 2024. 2 stations with recent sampling for other pollutants also list an older lead monitor; they appear as other monitoring.

All markers are existing regional EPA monitors, separate from monitoring set up for the detonation. Each station lists the pollutants in EPA's station record.

The brown dot marks the approximate center of the plant. The detonation point is not marked.

About our sources

We gather information from government agencies, courts, universities and news reporting. Learn where our data comes from, how we verify it, and how we preserve historical records in Sources & Methodology.