# Release 2026-11-24.3

Released 2026-11-24T00:43:21.328Z · data cutoff 2026-11-24T00:43:13.186Z · predecessor 2026-11-24.2

Reviewer corrections to 2026-11-24.2: the administrative stay shows both dates (order dated November 19 on its face; the court's November 23 opinion says issued November 20) citing both court documents; all nine permit obligations carry their trigger, marked unverified, with status undetermined and status notes that match their timing.

## Added records (13)
- evt-2026-11-19-eighth-circuit-admin-stay.r2 — Eighth Circuit enters administrative stay
- obl-permit-iv-g-1-i.r2 — Preliminary plume impact estimate
- obl-permit-iv-g-1-ii-a.r2 — Updated plume impact estimate (48 hours before)
- obl-permit-iv-g-1-ii-b.r2 — Hourly plume impact estimates during the activity
- obl-permit-iv-g-1-iii.r2 — Post-detonation plume impact estimate
- obl-permit-iv-g-3.r2 — Atmospheric dispersion modeling report to EPA
- obl-permit-iv-q-1.r2 — Monitoring at the treatment area and off-site locations
- obl-permit-iv-q-2.r2 — Final Impact Area Report to EPA
- obl-permit-iv-u-2-ii-sampling.r1 — Post-detonation soil and surface wipe sampling
- obl-permit-iv-u-2-ii-work-plan.r1 — Laboratory report and Phase 1 Remediation Work Plan
- pub-admin-stay.r2 — Eighth Circuit administrative stay order, No. 26-3374 (PDF)
- rev-obligations-2026-11-24-triggers
- rev-release-2026-11-24.2-reviewer

## Superseded (11)
- evt-2026-11-19-eighth-circuit-admin-stay.r1 → superseded by evt-2026-11-19-eighth-circuit-admin-stay.r2
- obl-permit-iv-g-1-i.r1 → superseded by obl-permit-iv-g-1-i.r2
- obl-permit-iv-g-1-ii-a.r1 → superseded by obl-permit-iv-g-1-ii-a.r2
- obl-permit-iv-g-1-ii-b.r1 → superseded by obl-permit-iv-g-1-ii-b.r2
- obl-permit-iv-g-1-iii.r1 → superseded by obl-permit-iv-g-1-iii.r2
- obl-permit-iv-g-3.r1 → superseded by obl-permit-iv-g-3.r2
- obl-permit-iv-q-1.r1 → superseded by obl-permit-iv-q-1.r2
- obl-permit-iv-q-2.r1 → superseded by obl-permit-iv-q-2.r2
- obl-permit-iv-u-2-ii-sampling → superseded by obl-permit-iv-u-2-ii-sampling.r1
- obl-permit-iv-u-2-ii-work-plan → superseded by obl-permit-iv-u-2-ii-work-plan.r1
- pub-admin-stay.r1 → superseded by pub-admin-stay.r2

## Failed checks and failed captures (0)

## Review

Approve with `npm run atp -- approve 2026-11-24.3 --reviewer <name>` after checking each added claim against its capture.